HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
This is an obsolete version of the rule. Please click on the rule number to view the current version.

17.36.802    FEE SCHEDULES

(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees:

 

 
UNIT
UNIT COST
TYPE OF LOTS
 
 
Subdivision lot
lot/parcel
$75
Condominium/trailer court/recreational camping vehicle campground
unit/space
$30
Resubmittal fee – previously approved lot, boundaries are not changed
lot/parcel
$50
TYPE OF WATER SYSTEM
 
 
Individual or shared water supply system (existing and proposed)
unit
$50
 
 
 
UNIT
 
UNIT COST
 
Multiple user system
- new system
 
 
 
 
- connection to approved
existing distribution
system
- extension to existing
distribution system
- new distribution system
 
each
 
 
 
 
 
lot/unit
 
 
lot/unit
 
lot/unit
 
 
$250 (plus $50/hour for review in excess of five hours)
 
$ 15
 
 
$ 30
 
$ 30
 
Public water system
New system per DEQ-1
 
 
 
- connection to existing system
- extension of existing system
- new distribution system
 
 
component
 
 
 
lot/structure
lot/structure
lot/structure
 
 
per ARM 17.38.106 fee schedule
 
$ 15
$ 30
$ 30
 
TYPE OF WASTEWATER DISPOSAL
 
 
 
Existing systems
 
unit
 
$ 50
 
New subsurface system
 
drainfield
 
$ 60
 
New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, and nutrient removal
 
design
 
 
 
 
 
 
$150 (plus $50/hour for review in excess of three hours)
 
 
 
 
UNIT
 
UNIT COST
 
Drainfields for pressured-dosed, intermittent sand filter, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, and nutrient removal
 
drainfield
 
$ 30
 
Multiple user wastewater system
- connection
- extension
- new collection system
 
 
lot/unit
lot/unit
lot/unit
 
 
 
$ 15
$ 30
$ 30
 
 
New public wastewater system per DEQ-2
 
 
- New connection to existing
system
- New extension to existing
public wastewater system
- New public wastewater
collection system
 
component
 
 
 
lot/structure
 
lot/structure
 
lot/structure
 
per ARM 17.38.106 fee schedule
 
$ 15
 
$ 30
 
$ 30
 
 
OTHER
 
 
 
 
 
Deviation from circular
 
 
request or per design
 
$100
(plus $50/hour for review in excess of two hours)
 
Waiver from rule
 
request
 
$100 (plus $50/hour for review in excess of two hours)
 
 
 
UNIT
 
UNIT COST
 
Reissuance of original approval statement
 
request
 
$ 50
 
Municipal facilities exemption checklist (former master plan exemption)
 
application
 
$ 75
 
Nonsignificance determinations/categorical exemption reviews
- individual/shared systems
 
- multiple-user and public systems
 
 
 
drainfield
 
lot/structure
 
 
 
$ 40
 
$ 20
 
Storm drainage plan review
 
- plans exempt from Circular DEQ-8
 
- Circular DEQ-8 review
 
 
   
 
plan
 
plan
 
 
 
$ 25
 
$ 50 (plus $50/hour for review in excess of one hour)
 
Preparation of environmental
assessments/environmental
impact statements
 
----
 
actual cost

History: 76-4-105, MCA; IMP, 76-4-105, 76-4-128, MCA; NEW, EMERG, Eff. 5/15/75; NEW, Eff. 9/5/75; AMD, Eff. 5/6/76; AMD, EMERG, 1977 MAR p. 536, Eff. 9/6/77; AMD, 1977 MAR p. 750, Eff. 10/25/77; AMD, 1980 MAR p. 2967, Eff. 11/29/80; AMD, 1981 MAR p. 1288, Eff. 10/30/81; AMD, 1983 MAR p. 851, Eff. 7/15/83; AMD, 1984 MAR p. 1027, Eff. 7/13/84; AMD, 1992 MAR p. 2145, Eff. 9/25/92; AMD, 1993 MAR p. 542, Eff. 4/16/93; TRANS, from DHES, 1996 MAR p. 1499; AMD, 1998 MAR p. 646, Eff. 3/13/98; AMD, 2002 MAR p. 1465, Eff. 5/17/02.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security