(1) Water wells which have been
constructed and do not provide an adequate supply of water for the use for
which they were drilled (dry hole) are not to be considered completed until the
well driller either:
(a) removes the casing and fills the hole with cement grout, concrete, or bentonite
clay grout, or
(b) constructs the well in accordance with minimum well construction standards and welds a
1/4-inch thick steel plate fully covering the top of the casing providing a
watertight seal.
(2) A water well log report must be completed and filed with each dry hole, within 60
days after moving the drilling
equipment from the drill site.