17.36.802 FEE SCHEDULES (1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees:
|
UNIT |
UNIT COST |
|
|
|
TYPE OF LOTS |
|
|
|
Subdivision lot |
lot/parcel |
$125 |
Condominium/trailer court/recreational camping vehicle campground |
unit/space |
$50 |
Resubmittal fee – previously approved lot, boundaries are not changed |
lot/parcel |
$75 |
|
|
|
TYPE OF WATER SYSTEM |
|
|
|
Individual or shared water supply system (existing and proposed) |
unit |
$85 |
Multiple user system (non-public) |
|
|
- new system |
each |
$ 315 (plus $105/hour for review in excess of four hours) |
|
|
|
- new distribution system design
|
lineal foot |
$0.50 |
- connection to distribution system |
lot/unit |
$70 |
|
|
|
|
|
|
|
|
|
|
|
|
Public water system |
|
|
New system per DEQ-1 |
component |
per ARM 17.38.106 fee schedule |
|
|
|
- new distribution system design |
lineal foot |
$0.50 |
- connection to distribution system |
lot/structure |
$70 |
|
|
|
|
|
|
|
|
|
TYPE OF WASTEWATER DISPOSAL |
|
|
|
Existing systems |
unit |
$75 |
New gravity fed system |
drainfield |
$95 |
New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems |
design |
$ 190 (plus $105/hour for review in excess of two hours) |
New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems |
drainfield |
$50 |
Gray water reuse systems. This is a stand-alone fee and all gray water reuse systems will be reviewed at the unit cost |
unit |
$ 95 (plus $105/hour in excess of two hours) |
Multiple user wastewater system (non-public) |
|
|
- new collection system design |
lineal foot |
$0.50 |
- connection to collection system |
lot/unit |
$70 |
|
|
|
New public wastewater system per DEQ-2 |
component |
per ARM 17.38.106 fee schedule |
|
|
|
- new collection system design |
lineal foot |
$0.50 |
- connection to collection system |
lot/structure |
$70 |
|
|
|
|
|
|
|
|
|
OTHER |
|
|
|
Deviation from circular |
request or per design |
$ 200 (plus $105/hour for review in excess of two hours) |
|
|
|
Waiver from rule |
request |
$ 200 (plus $105/hour for review in excess of two hours) |
Reissuance of original approval statement |
request |
$60 |
Review of revised lot layout document |
request |
$125 |
Municipal facilities exemption checklist (former master plan exemption) |
application |
$100 |
Nonsignificance determinations/categorical exemption reviews |
|
|
- individual/shared systems |
drainfield |
$60 |
|
|
|
- multiple-user non-public systems |
lot/structure |
$30 |
|
|
|
- public systems |
drainfield |
per ARM 17.38.106 fee schedule |
|
|
|
Storm drainage plan review |
|
|
|
|
|
- plans exempt from Circular DEQ-8 |
lot |
$40 |
|
|
|
- Circular DEQ-8 review |
design |
$180 |
|
|
|
|
lot |
$ 40 (plus $105/hour for review in excess of 30 minutes per lot) |
Preparation of environmental |
---- |
actual cost |
assessments/environmental |
impact statements | History: 76-4-105, MCA; IMP, 76-4-105, 76-4-128, MCA; NEW, EMERG, Eff. 5/15/75; NEW, Eff. 9/5/75; AMD, Eff. 5/6/76; AMD, EMERG, 1977 MAR p. 536, Eff. 9/6/77; AMD, 1977 MAR p. 750, Eff. 10/25/77; AMD, 1980 MAR p. 2967, Eff. 11/29/80; AMD, 1981 MAR p. 1288, Eff. 10/30/81; AMD, 1983 MAR p. 851, Eff. 7/15/83; AMD, 1984 MAR p. 1027, Eff. 7/13/84; AMD, 1992 MAR p. 2145, Eff. 9/25/92; AMD, 1993 MAR p. 542, Eff. 4/16/93; TRANS, from DHES, 1996 MAR p. 1499; AMD, 1998 MAR p. 646, Eff. 3/13/98; AMD, 2002 MAR p. 1465, Eff. 5/17/02; AMD, 2009 MAR p. 2477, Eff. 12/25/09; AMD, 2013 MAR p. 1827, Eff. 10/18/13; AMD, 2014 MAR p. 2098, Eff. 9/19/14.
|