HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
This is an obsolete version of the rule. Please click on the rule number to view the current version.

17.36.802    FEE SCHEDULES

(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees:

UNIT

UNIT COST

TYPE OF LOTS

Subdivision lot

lot/parcel

$125

Condominium/trailer court/recreational camping vehicle campground

unit/space

$50

Resubmittal fee – previously approved lot, boundaries are not changed

lot/parcel

$75

TYPE OF WATER SYSTEM

Individual or shared water supply system (existing and proposed)

unit

$85

Multiple user system (non-public)

- new system

each

$ 315 (plus $105/hour for review in excess of four hours)

- new distribution system design

lineal foot

$0.50

- connection to distribution system

lot/unit

$70

 

 

 

 

Public water system

New system per DEQ-1

component

per ARM 17.38.106 fee schedule

- new distribution system design

lineal foot

$0.50

- connection to distribution system

lot/structure

$70

 

 

 

 

TYPE OF WASTEWATER DISPOSAL

Existing systems

unit

$75

New gravity fed system

drainfield

$95

New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems

design

$ 190 (plus $105/hour for review in excess of two hours)

New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems

drainfield

$50

Gray water reuse systems. This is a stand-alone fee and all gray water reuse systems will be reviewed at the unit cost

unit

$ 95 (plus $105/hour in excess of two hours)

Multiple user wastewater system (non-public)

- new collection system design

lineal foot

$0.50

- connection to collection system

lot/unit

$70

 

 

New public wastewater system per DEQ-2

component

per ARM 17.38.106 fee schedule

- new collection system design

lineal foot

$0.50

- connection to collection system

lot/structure

$70

 

 

 

 

OTHER

Deviation from circular

request or per design

$ 200 (plus $105/hour for review in excess of two hours)

Waiver from rule

request

$ 200 (plus $105/hour for review in excess of two hours)

Reissuance of original approval statement

request

$60

Review of revised lot layout document

request

$125

Municipal facilities exemption checklist (former master plan exemption)

application

$100

Nonsignificance determinations/categorical exemption reviews

- individual/shared systems

drainfield

$60

 

 

- multiple-user non-public systems

lot/structure

$30

 

 

- public systems

drainfield

per ARM 17.38.106 fee schedule

 

 

Storm drainage plan review

- plans exempt from Circular DEQ-8

lot

$40

- Circular DEQ-8 review

design

$180

lot

$ 40 (plus $105/hour for review in excess of 30 minutes per lot)

Preparation of environmental

----

actual cost

assessments/environmental

impact statements

History: 76-4-105, MCA; IMP, 76-4-105, 76-4-128, MCA; NEW, EMERG, Eff. 5/15/75; NEW, Eff. 9/5/75; AMD, Eff. 5/6/76; AMD, EMERG, 1977 MAR p. 536, Eff. 9/6/77; AMD, 1977 MAR p. 750, Eff. 10/25/77; AMD, 1980 MAR p. 2967, Eff. 11/29/80; AMD, 1981 MAR p. 1288, Eff. 10/30/81; AMD, 1983 MAR p. 851, Eff. 7/15/83; AMD, 1984 MAR p. 1027, Eff. 7/13/84; AMD, 1992 MAR p. 2145, Eff. 9/25/92; AMD, 1993 MAR p. 542, Eff. 4/16/93; TRANS, from DHES, 1996 MAR p. 1499; AMD, 1998 MAR p. 646, Eff. 3/13/98; AMD, 2002 MAR p. 1465, Eff. 5/17/02; AMD, 2009 MAR p. 2477, Eff. 12/25/09; AMD, 2013 MAR p. 1827, Eff. 10/18/13; AMD, 2014 MAR p. 2098, Eff. 9/19/14.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security